With the preparation of the detailed project report (DPR) for the construction of an elevated corridor, planned as part of a semi ring road in the city, dragging on, Tiruchi MP Durai Vaiko has sought a status report on the project from the Union Ministry of Highways and Road Transport.
In 2024, the National Highways Authority of India (NHAI) decided to prepare a combined DPR for building a four-lane bypass between Panjapur and Thindukarai on Tiruchi-Karur National Highway, along with the elevated corridor at Panjapur, and widening the two-lane bypass between Thuvakudi and Panjapur into a four-lane way.
Published – March 17, 2026 06:07 pm IST


