Power shutdown in parts of Tiruchi on August 25

Mr. Jindal
1 Min Read

Power supply will be suspended between 9.45 a.m. and 4 p.m. on August 25 in the following places owing to maintenance work to be taken up by the Tamil Nadu Power Distribution Corporation at the Vengaimandalam sub-stations in Tiruchi district:

Moovanur, Vengaimandalam, Thaneerpandal, Mela Kannukulam, Keezha Kannukulam, Parvathipuram, Kuruvampatti, Kallur, Veppanthurai, Chozhanganallur, Senthamaraikan, Sirugambur, No1.Kariyamanickam, Sennakarai, Ramagiripatti, Senkudi, Vazhmalpalayam, Chettimangalam, Neiveli, Killiyanallur, Vathalai, V.Maniampatti, Silaiyaathi, Thudaiyur, Pandiyapuram, Sunaippuganallur, Eachampatti, Moovarayampalayam, Koundampatti, Kuruvikarankulam, Kattukulam, Theerampalayam, Thillampatti, Pazhaiyur, Senkuzhipatti, Udaiyampatti, Thirupainjeeli, Thiruvarangapatti, Peramangalam, Chathirapatti, Mayandikottam, Kalavaipatti, Poonampalayam, Thiruvellarai, Rasampalayam, Salakadu, Pulivalam, Manparai, Santhanapatti, Pudupatti, Pazhampudur, Thiruthalaiyur and Nallayampatti.

Share This Article
Leave a Comment