The Greater Chennai Corporation will close the Marina swimming pool from July 11 to 31 for installation of a 135-metre backwash pipe, nine soak pits, and trial flow works to support uninterrupted functioning of the water purification system, a release said.
Published – July 10, 2025 07:36 am IST